A photo of the multl-story office building and mmTron's door sign. The text reads "mmTron Expands Offices and Lab"
October 24, 2023
To Support Growth, mmTron Moves to New Office, Expanded Lab

To support the market’s interest in our mmWave products, we moved into larger offices during the summer. Our new space has an expanded lab for development and production testing, with the following capabilities:

— Keysight 4-port PNA-X,
— Keysight spectrum analyzer,
— Rohde & Schwarz 20 giga-sample-per-second (GSPS) oscilloscope,
— Keysight transistor modeling system,
— power meters, and
— programmable power supplies.

Two probe stations from FormFactor enable on-wafer testing. One is capable of interfacing with frequency extenders for measurements to THz.

The new space also includes wire bond assembly, incoming and outgoing inspection, and inventory storage with N2 desiccators, as well as offices for team members.

We’re still in Redwood City, less than ½ mile from our previous location.

A photo of Michael Roberg, Engineering Fellow, in the lab at mmTron's new office.
Michael Roberg, Engineering Fellow, in the lab at mmTron's new office.